Skip to content
(365) 399-5986

Department of the Counter

Kitchen Sink Installation in Oakville

New counters, a new sink, or a swap from double bowl to one deep basin. The plumbing underneath has to fit the plan.

  • Clear diagnosis before any cutting or replacing
  • Price explained before the work starts
  • Tested with water running before we leave
  • Booked by phone, no forms
Call now

or ring (365) 399-5986Real people answer. Bookings by phone only.

  • Licensed & insured (details on request)
  • Oakville & Halton
  • Phone bookings only
A kitchen with marble counters and fitted cabinetry
A kitchen with marble counters and fitted cabinetry.

What gets connected

A kitchen sink installation joins the basin to the drain through a strainer, tailpiece and P-trap, connects hot and cold supplies to the faucet with shut-off valves, and links the dishwasher drain and any disposal. Undermount sinks are often set by the countertop installer, with the plumber completing the connections once the stone is in.

Job sheet: Kitchen Sink Installation in Oakville

Where we get in
Countertop cut-out, drain stub in the wall and the supply stops
On the van
Sink clips, basket strainers, trap kit, dishwasher tailpiece, silicone
Before we pack up
Sink filled to the brim then drained with the dishwasher running
How to book
Phone only: (365) 399-5986

Where it gets tricky

  • A deeper new sink can put the drain outlet below the existing trap arm, needing the drain lowered in the wall.
  • Moving the sink to an island needs a new drain route and proper venting, often an air admittance valve where code permits.
  • Old shut-off valves often fail when first turned in years.

Signs you need this now

  • Cracked or chipped sink
  • New countertop going in
  • Switching to an undermount sink
  • Leaking strainer that keeps failing
  • Adding a garbage disposal

Before you book

  1. Have the sink and faucet on site with their instructions.
  2. Confirm whether the counter will be cut and the sink set by your fabricator.
  3. Clear out the sink cabinet.

The visit in five steps

  1. 1Disconnect and remove the old sink
  2. 2Set the new sink and clamp it
  3. 3Fit strainers and the drain trap
  4. 4Connect faucet supplies and dishwasher
  5. 5Fill, drain and check for drips

The install

Supplies are fitted with new quarter-turn valves if needed, the faucet is mounted, the drain assembled with a proper trap, and the dishwasher connected with an air gap or high loop. Everything is run, filled and drained, and every joint is checked dry with paper towel.

Grease from the new sink goes the same way as the old one. Our what not to pour down the drain guide applies here too.

Related services

Adding a disposal? See garbage disposal installation. Faucet only? See faucet repair and replacement. Slow drain afterwards? Kitchen drain cleaning.

Straight answers to common calls

Can a sink move to an island?

Often yes, with a new drain route and suitable venting. Basement access below helps a great deal.

Do I require new shut-off valves?

If the old ones are stiff or leak, replacing them during the install is wise.

Keep reading

Ready when you are

One call books the visit. Tell us what you are seeing and we will tell you straight what it likely is.

Call (365) 399-5986
Call now · (365) 399-5986